Khumani Iron Ore Operations

Real-time monitoring & production analytics

Ore Processed MTD
2.4Mt
+8%
Active Equipment
34/40
-2
Safety Score
94.2
187d LTI-free
Revenue MTD
$84.3M
+5.2%
Stripping Ratio
4.2:1
-0.3
Plant Availability
91.3%
+1.1%

Monthly Ore Tonnage (vs Target)

Fleet Status

AssetTypeStatusUtil %Last Svc
HT-104Haul TruckActive87.2%2024-03-10
EX-02ExcavatorMaintenance0.0%2024-03-18
DR-08DrillActive92.1%2024-02-28
CR-11CrusherOffline0.0%2024-01-15
HT-205Haul TruckActive78.5%2024-03-12

Recent Safety Events

Minor hydraulic leak on EX-02 isolated & contained.

Medium

Pit B Sector 42024-03-15

Unplanned slope movement detected near waste dump.

High

North Wall2024-03-12

PPE compliance audit passed with minor recommendations.

Low

Processing Plant2024-03-08

Dust suppression system malfunction resolved.

Medium

Haul Road 32024-03-02

Live Alerts Feed

Critical 10:42 AM

CR-11 primary crusher bearing temperature exceeds threshold.

Equipment
High 09:15 AM

Hourly throughput dropped 12% below target on Line 2.

Production
Medium 08:50 AM

Gas detection alarm triggered in underground ventilation shaft.

Safety
Low 07:30 AM

Piezometer readings show slight groundwater level rise.

Geotech